Plant record / Commercial
Pyrum Dillingen/Saar thermolysis plant
operating; reactors TAD 2 and TAD 3 reported transferred to regular operation, downstream rCB milling/pelletising not yet at target throughput.
Technology family: Continuous Pyrum thermolysis reactor (company-described), with downstream milling and pelletising of the solid fraction into recovered carbon black · Evidence checked 19 November 2026Status, then and now
As reported: operating; reactors TAD 2 and TAD 3 reported transferred to regular operation, downstream rCB milling/pelletising not yet at target throughput.101102103104
Current: Reported in operation by the cited source (as of 2026-11-17). Where a source reports operation, that is the source’s statement at its own date; no independently measured present-day throughput or uptime is claimed here.
Maturity as described: industrial / commercial operation at the company's own reference site, with the downstream milling and pelletising line still in ramp-up as of the Q3 2026 report.
Capacity observations
| Observation | Measurement basis | Source |
|---|---|---|
| approx. 22,700 metric tons of end-of-life tyres per year | reference / generic design capacity. — Stated by the company as the capacity of a STANDARD Pyrum plant with three reactors, used as a market comparison. not verified in reviewed sources by the company as a measured Dillingen throughput. — Reporting basis: company self-reported. | 101 |
| approx. 20,000 tons of end-of-life tyres delivered annually to Dillingen | site intake figure (company process description). — Company website process description; the same page footnotes that a future standard facility will be able to recycle over 22,000 tons annually. Treat as a company-stated site figure, not an audited throughput. — Reporting basis: company self-reported. | 103 |
| approx. 9,000 tons of tyres processed in the shredding plant in 2025 | reported actual throughput. — Reported in the company's 2025 annual report for the shredding (pre-treatment) step, in a water-consumption disclosure. It is the only plant-level actual-tonnage figure located. It covers a different scope (shredding input for one calendar year) from the generic standard-plant capacity reference, so the two are not comparable. — Reporting basis: company self-reported. | 102 |
| milling/pelletising throughput up to 1,250 kg/h achieved versus 1,650 kg/h guaranteed by the equipment manufacturer | downstream bottleneck (actual vs guaranteed). — Company-reported shortfall as of the Q3 2026 report; a variable dosing system is planned, with tests scheduled for completion by March 2027. — Reporting basis: company self-reported. | 101 |
How to read this: Do not merge these numbers; they differ in scope and kind. The 22,700 t/y figure is a generic standard-plant reference used by the company for market comparison. Approximately 20,000 t/y is a company description of site intake. Approximately 9,000 t of tyres shredded during 2025 is a reported actual tonnage for the shredding step in that calendar year. No independent verification of any figure was found.
Companies and their documented role here
- Pyrum Innovations AG ↗ — owner and operator of this plant. company reports this site as its own facility at its headquarters.101102
- Pyrum Innovations AG ↗ — developer of the thermolysis technology used here. company self-description.101
Products reported
- thermolysis oil (ThermoTireOil, company trademark; supplied to BASF)
- recovered carbon black (ThermoTireBlack, company trademark; supplied to Continental and Schwalbe)
- process gas used for on-site power and heat
- recovered steel wire returned to steel production
Products as described by the cited sources.
Not verified in reviewed sources
- No independent (third-party audited) throughput or product-quality measurement was located; all plant performance figures here are company-reported.
- Second company site at Perl-Besch and third-party projects (Czech Republic, Greece, Sweden) are under construction or in development and are NOT counted as operating capacity.
How this record was qualified
- Every capacity and throughput figure is self-reported by the company, in regulatory filings but without independent verification of plant performance.
- Generic standard-plant capacity, company-stated site intake and the one reported actual annual tonnage are listed separately; they differ in scope and are not presented as comparable measures.
- Group financial performance is not used here as evidence of plant operating status, and no inference of distress or failure is made.
- Projects at Perl-Besch, in the Czech Republic, Greece and Sweden are in construction or development and are excluded from operating capacity.
Sources & evidence dates
- Pyrum Innovations AG - Consolidated Interim Report, 1 January to 30 September 2026. company interim report (self-reported, not audited) Retrieved 19 November 2026.
- Pyrum Innovations AG Annual Report 2025. company annual report (includes independent auditor's report) Retrieved 19 November 2026.
- Pyrum - Raw Material Recovery from Tires via Thermolysis (company homepage). company self-description (undated page) Retrieved 19 November 2026.
- Pyrum Innovations AG - Consolidated Interim Report, 1 January to 30 September 2025. company interim report (self-reported, not audited) Retrieved 19 November 2026.