German listed thermolysis company recycling end-of-life tyres at its own Dillingen/Saar plant, supplying oil to BASF and recovered carbon black to tyre makers. Reactors in regular operation since early 2025; the downstream carbon-black milling line was still below guaranteed throughput at the Q3 2026 report.
Technology: Continuous Pyrum thermolysis reactor · Company address or headquarters only. Not a plant location. · Evidence checked 19 November 2026
Roletechnology developer / plant owner and operator (own Dillingen site)101102
Plants in this record1 published record
Evidence checked2026-11-19
What the record establishes.
DILLINGEN/SAAR, SAARLAND2026-11
Pyrum Dillingen/Saar thermolysis plant
operating; reactors TAD 2 and TAD 3 reported transferred to regular operation, downstream rCB milling/pelletising not yet at target throughput. Do not merge these numbers; they differ in scope and kind. The 22,700 t/y figure is a generic standard-plant reference used by the company for market comparison. Approximately 20,000 t/y is a company description of site intake. Approximately 9,000 t of tyres shredded during 2025 is a reported actual tonnage for the shredding step in that calendar year. No independent verification of any figure was found.101102104
Germany · end-of-life tyres (shredded rubber granulate; steel and textile separated upstream) Reported in operation by the cited source (as of 2026-11-17).
Linked plant records
Each installation is a separate record with its own feedstock, location,
stage, capacity observations and sources.
Pyrum Innovations AG both owns a plant and sells its tyre-pyrolysis technology. At its Dillingen/Saar headquarters it runs its own thermolysis line; separately it supplies reactors and licences to project companies in the Czech Republic, Greece and Sweden, which are not operating assets. The company's filings keep three capacity numbers apart, and so should any buyer: a generic three-reactor reference of roughly 22,700 tonnes of tyres a year, a stated Dillingen intake of about 20,000 tonnes a year, and approximately 9,000 tonnes actually shredded during 2025, each covering a different scope. Reactors TAD 2 and TAD 3 entered regular operation after full-load tests, and oil deliveries rose to three or four per week from September 2026. The constraint is downstream: the milling and pelletising line reached up to 1,250 kg/h against 1,650 kg/h guaranteed, with corrective tests scheduled into 2027. All performance figures are company-reported; no independent measurement was located.
What is not establishedEvery capacity and throughput figure is self-reported by the company, in regulatory filings but without independent verification of plant performance.
Deliberately left out of this profile
No independent (third-party audited) throughput or product-quality measurement was located; all plant performance figures here are company-reported.
Second company site at Perl-Besch and third-party projects (Czech Republic, Greece, Sweden) are under construction or in development and are NOT counted as operating capacity.
A listing here is not an endorsement, and no operational rating is assigned.