Company profile / Germany

Liegenschafts-und Innovations (LIG)

The Miltzow record demonstrates why a functioning tire-preparation business must not be counted as a commissioned pyrolysis plant.

Technology: Tire pyrolysis with char upgrading · Historical reference with separately dated updates · Evidence checked 19 November 2026
TechnologyTire pyrolysis with char upgrading40114061
Historical scaleConstruction-stage project4011
Evidence basisMay 2004 + separately dated updates40114061

What the record establishes.

Historical reference May 2004 assessment

The documented installation and scale

Juniper distinguished the completed mechanical-processing stage at Miltzow from the proposed pyrolysis stage. The latter was designed for 25,000 tonnes per year of shredded tires, but the report states that its construction stopped in 2003. Mechanical-processing volumes are not pyrolysis throughput.4011

Open the full plant record ↗

Juniper, printed pages 254–261. Historical evidence, not current output.
Evidence boundary May 2004 assessment

What the historical reference does not prove

The project involved LIG, Weidleplan and subsequently Enviba. The 2004 account describes changes in the engineering and project-development arrangements. This profile does not repeat unadjudicated allegations about those parties as independently established findings.4011

Feedstock, process scope and operating evidence kept separate.
Later evidence Later company account, undated

A later project listing does not resolve commissioning

Geelhoed's experience page lists a 2003 waste-tire and pyrolysis project at Miltzow with a 25,000-ton figure. It provides no operating period or measured production in that entry. The listing therefore does not resolve whether the pyrolysis section was subsequently completed or commissioned.4061

Later source checked separately from the 2004 assessment.

Linked plant records

Each installation is a separate record with its own feedstock, location, stage, capacity observations and sources.

What is not established Completion after the reported 2003 construction stop, current operations and verified pyrolysis output were not established. The later experience listing is retained as limited, not conclusive, evidence.

Deliberately left out of this profile

  • Historical prices treated as present quotations
  • Unsupported claims of present plant performance
  • Private contact details and engineering drawings

A listing here is not an endorsement, and no operational rating is assigned. How records are built ↗

Sources & evidence dates

  1. Juniper Consultancy Services, Emerging Solutions for Recovering Value from Scrap Tyres, May 2004, pp. 254–261: Liegenschafts-und Innovations (LIG). Historical assessment held on file. Original printed page numbers; not a present operating audit. Retrieved 19 November 2026.
  2. Geelhoed Group, About / Experience Pyrolysis, undated company webpage, retrieved November 2026. Scope and evidence limitations are stated in the profile. A later mention is not a current operating audit. Retrieved 19 November 2026.

Get project help

Tell us about your project.

Requests are stored privately and reviewed by a person. No response time is promised here, and nothing is published from this form.

Read the privacy notice ↗

Prefer email? Write to [email protected]. The full version of this form is on the project help page.

Submit information

Add to the industry picture.

Submissions go into a private review queue and are checked against their sources before anything is published. Nothing is published automatically, and a listing is not an endorsement.

Read the privacy notice ↗

Prefer email? Write to [email protected]. The full version of this form is on the submit information page.