A historical British batch-pyrolysis developer with a semi-commercial reference at Witney. The 2004 assessment records the site's closure rather than a continuing operation.
Technology: Batch pyrolysis / carbonization · Historical reference: May 2004 · Evidence checked 19 November 2026
Juniper described development with the United Kingdom Atomic Energy Authority and a 4,000-tonne-per-year semi-commercial installation at Witney, Oxfordshire, in 2000. The report's summary states that the Witney site closed in 2001.4003
Juniper, printed pages 204–211. Historical evidence, not current output.
Evidence boundaryMay 2004 assessment
What the historical reference does not prove
The assessment described low-volume batch treatment of scrap tires. It identified the cost implications of multiplying batch units to reach higher throughput. A successful individual batch does not establish the annual production or staffing requirements of a larger installation.4003
Feedstock, process scope and operating evidence kept separate.
Linked plant records
Each installation is a separate record with its own feedstock, location,
stage, capacity observations and sources.
What is not establishedCurrent ownership of the technology, licensing availability and subsequent operating references were not established. The historical closure statement is attributed to Juniper, not presented as a new registry finding.
Deliberately left out of this profile
Historical prices treated as present quotations
Unsupported claims of present plant performance
Private contact details and engineering drawings
A listing here is not an endorsement, and no operational rating is assigned.
How records are built ↗
Sources & evidence dates
Juniper Consultancy Services, Emerging Solutions for Recovering Value from Scrap Tyres, May 2004, pp. 204–211: Beven Recycling. Historical assessment held on file. Original printed page numbers; not a present operating audit. Retrieved 19 November 2026.